THAI SHINRYO LIMITED, an affiliated company of SHINRYO CORPORATION in Japan, was established in Thailand since February 12, 1986 and over thirty years experienced dynamic growth through our fully integrated services of Engineering, Procurement, Construction, and Commissioning provided to our customers.
Project Categories
Bangpa-in Cogeneration Phase 1 Project (BIC1)
SHINRYO is an EPCC Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1)
SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC1 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.
Project Description
The BIC1 shall comprise, as a minimum, two Gas Turbine Generators, two Heat Recovery Steam Generators, one Steam Turbine Generator, and one Auxiliary Boiler including their ancillary equipment.
Configuration
Gas Turbine Generator
LM6000 PD x 2 units novated from Owner
Heat Recovery Stream Generator
57 ton/hour x 2 units
Steam Turbine Generator
23 MW x 1 unit
Auxiliary Gas Boiler
20 ton/hour x 1 unit
Water Treatment Plant
22 kV Substation and 115 kV GIS Substation
Power Distribution and Supply System and Auxiliary Substation
Steam Distribution and Supply System
Project Owner: Bangpa-in Cogeneration Limited (BIC)
Construction Period: November 2014 – June 2017
Commercial Operation Date: June 2017
Bangpa-in Cogeneration Phase 2 Project (BIC2)
SHINRYO is an EPCC Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2)
Bangpa-in Cogeneration Phase 2 Project (BIC2)
SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC2 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.
Project Description
BIC2 shall consist of 2 (two) LM6000 PD Gas Turbine Generator Packages (GTG) which are novated from Owner with Inlet Air System, 2 (two) Heat Recovery Steam Generators (HRSG) capacity 57 ton/hour/unit, and 1 (One) extraction-condensing Steam Turbine Generator (STG) capacity 26 MW/unit and Water Treatment Plant.
Configuration
Gas Turbine Generator
LM6000 PD x 2 units novated from Owner
Heat Recovery Stream Generator
57 ton/hour x 2 units
Steam Turbine Generator
26 MW x 1 unit
Water Treatment Plant
Project Owner : Bangpa-in Cogeneration Limited (BIC)
Construction Period : November 2014 – June 2017
Commercial Operation Date : June 2017
Bangchak Utility Project
This Project is the Combined Heat and Power (CHP) Plant...
Bangchak Utility Project
This Project is the Combined Heat and Power (CHP) Plant that located within the Bangchak refinery complex in Bangkok.
Project Description
The CHP Plant consist of 2 Gas Turbine Generator (GTG), 2 Heat Recovery Steam Generator (HRSG) with supplementary firing and 1 Auxiliary Boiler for serving as back up steam source.
Configuration
Gas Turbine Generator
Titan 130, 12 MW x 2 units
Heat Recovery Stream Generator
48 ton/hour, 45.5 barg x 2 units
Auxiliary Gas Boiler
48 ton/hour, 45.5 barg x 1 unit
Project Owner : PTT Public Company Limited (PTT)
Construction Period : January 2008 – September 2009
Commercial Operation Date : May 2010
Central Utility Plant 2 (CUP-2)
This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.
Central Utility Plant (CUP-2)
This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.
Project Description
The Plant comprises 2 Gas Turbine Generate (GTG), 2 Heat Recovery Steam Generator (HRSG), 1 Steam Turbine Generator and 1 Auxiliary Boiler
Configuration
Gas Turbine Generator
Fr 6581-B, 38 MW x 2 units
Heat Recovery Stream Generator
140 ton/hour, 45 barg steam x 2 units
(full supplementary firing)
Steam Turbine Generator
38 MW x 1 unit
Auxiliary Gas Boiler
50 ton/hour, 45 barg x 1 unit
Temporary Auxiliary Gas Boiler
70 ton/hour, 45 barg x 2 units
Project Owner : PTT Utility Company Limited (PTTUT)
Construction Period : October 2006 – March 2009
Commercial Operation Date : May 2009
A District Cooling Plant (Initial Phase) of One Bangkok
One Bangkok Mixed Use Development Project ...
One Bangkok Mixed Use Development Project located in Prime CBD at the northeast corner of the intersection of Wireless, Rama IV, and Sathorn Road, Bangkok.
Project Description:
The District Cooling Plant will generate and supply chilled water to the end-user through a district cooling ring network. This 20,000RT plant capacity project is an Initial Phase of total 40,000RT after fully developed.
Scope of Work:
EPCC Work for DCS Plant (Initial Phase Cap. 20,000 RT + TES 10,710 RTH)
Construction Period:
January 2021 to January 2023
Chiller Plant Extension for SBIA
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Chiller Plant Extension for SBIA
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Project Description
The Plant is Steam Absorption Chiller System, including Mechanical Ventilation AC, Plumbing, Fire Protection, Electrical System and Civil Work
Configuration
Gas Turbine Generator
22.0 MW x 2 units
Heat Recovery Stream Generator
42.5 t/h x 2 units
Steam Turbine Generator
12.0 MW x 1 unit
Auxiliary Gas Boiler
18 t/h x 2 units and 20 t/h x 2 units
Steam Absorption Chiller for PTC
2,100 RT x 8 units (stage 1)
2,310 RT x 2 units (stage 2)
Steam Absorption Chiller for TG Catering
1,970 RT x 2 units + 1,500 RT x 3 units
Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : June 2005 – September 2006
CHPP Plant Modification Project (Contract 2)
EPCC Works, including demolish work and improvement...
Scale of project :
Scope of work : EPCC Works, including demolish work and improvement the existing equipment.
Usage : Power Plant and Chiller Plant at The New Government Complex, Bangkok.
Construction period : August 2016 to August 2017
Helper Cooling Tower for PTC Chiller Plant Project
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Helper Cooling Tower for PTC Chiller Plant Project
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Project Description
The Project is Engineering, Procurement and Construction for Cooling Tower 2 units, to increase chilled water capacity to accommodate the increasing air conditioning load of PTC Chiller Plant.
Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : August 2010 – March 2011
Environmental Control System
The Environmental Control System (ECS) comprises the following subsystems
Chilled Water System
Cooling Water System
Direct Refrigerant System
Process Chilled Water
Process Chilled Water
Steam Utility Pipe Work
Steam Utility Pipe Work
Compressed Air
Process Exhaust
Process Exhaust
Civil Work
Civil Work
Electrical System
Electrical System
Fire Protection System
Fire Protection System
Plumbing System
Plumbing System
MRT Orange Line (East Bound)
MRT Orange Line (East Bound)
Underground railway in Bangkok.
Scope of work: E&M Works for MRT Underground Stations;-
Construction period: October 2019 to November 2022.
M.R.T. Chaloem Ratchamongkhon Line (South Contract)
M.R.T. Chaloem Ratchamongkhon Line
(South Contract)
Underground railway in Bangkok.
Scope of work : Subcontractor of JOINT VENTURE BCKT for Environmental Control Systems and Fire Protection Systems for 4 stations (Queen Sirikit National Convention Centre Station, Sukhumvit Station, Phetchaburi Station, Phra Ram IX Station)
Construction period : May 2000 to August 2002.
M.R.T. Chaloem Ratchamongkhon Line (North Contract)
M.R.T. Chaloem Ratchamongkhon Line
(North Contract)
Underground railway in Bangkok.
Scope of work : Subcontractor of ION-Joint Venture for Environmental Control Systems and Tunnel Ventilation Systems for 4 stations (Thai Cultural Centre Station, Huai Khwang Station, Sutthisan Station and Ratchadapisek Station), LHD for 3 stations and Intervention Shafts no. 1,2 & 3.
Construction period : December 2000 to August 2002.
3656/18-19, Green Tower 7th Floor, Rama IV Road, Klongton, Klongtoey, Bangkok 10110 Thailand
Tel : +66(0) 2249 0870 Fax : +66(0) 2249 0895
Tel : +66(0) 2249 0870
Fax : +66(0) 2249 0895