THAI SHINRYO LIMITED, an affiliated company of SHINRYO CORPORATION in Japan, was established in Thailand since February 12, 1986 and over thirty years experienced dynamic growth through our fully integrated services of Engineering, Procurement, Construction, and Commissioning provided to our customers.

Project Categories

Cogeneration
BIC1

Bangpa-in Cogeneration Phase 1 Project (BIC1)

SHINRYO is an EPCC Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1)

Read More >>

Bangpa-in Cogeneration Phase 1 Project (BIC1)

SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC1 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.

Project Description

The BIC1 shall comprise, as a minimum, two Gas Turbine Generators, two Heat Recovery Steam Generators, one Steam Turbine Generator, and one Auxiliary Boiler including their ancillary equipment.

Configuration

Gas Turbine Generator

LM6000 PD x 2 units novated from Owner

Heat Recovery Stream Generator

57 ton/hour x 2 units

Steam Turbine Generator

23 MW x 1 unit

Auxiliary Gas Boiler

20 ton/hour x 1 unit

Water Treatment Plant

22 kV Substation and 115 kV GIS Substation

Power Distribution and Supply System and Auxiliary Substation

Steam Distribution and Supply System

Project Owner: Bangpa-in Cogeneration Limited (BIC)
Construction Period: November 2014 – June 2017
Commercial Operation Date: June 2017

DSC_0920

Bangpa-in Cogeneration Phase 2 Project (BIC2)

SHINRYO is an EPCC Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2)

Read More >>

Bangpa-in Cogeneration Phase 2 Project (BIC2)

SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC2 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.

Project Description

BIC2 shall consist of 2 (two) LM6000 PD Gas Turbine Generator Packages (GTG) which are novated from Owner with Inlet Air System, 2 (two) Heat Recovery Steam Generators (HRSG) capacity 57 ton/hour/unit, and 1 (One) extraction-condensing Steam Turbine Generator (STG) capacity 26 MW/unit and Water Treatment Plant.

Configuration

Gas Turbine Generator

LM6000 PD x 2 units novated from Owner

Heat Recovery Stream Generator

57 ton/hour x 2 units

Steam Turbine Generator

26 MW x 1 unit

Water Treatment Plant

Project Owner : Bangpa-in Cogeneration Limited (BIC)
Construction Period : November 2014 – June 2017
Commercial Operation Date : June 2017

Bangchak Utility Project

This Project is the Combined Heat and Power (CHP) Plant...

Read More >>

Bangchak Utility Project

This Project is the Combined Heat and Power (CHP) Plant that located within the Bangchak refinery complex in Bangkok.

Project Description

The CHP Plant consist of 2 Gas Turbine Generator (GTG), 2 Heat Recovery Steam Generator (HRSG) with supplementary firing and 1 Auxiliary Boiler for serving as back up steam source.

Configuration

Gas Turbine Generator

Titan 130, 12 MW x 2 units

Heat Recovery Stream Generator

48 ton/hour, 45.5 barg x 2 units

Auxiliary Gas Boiler

48 ton/hour, 45.5 barg x 1 unit

Project Owner : PTT Public Company Limited (PTT)
Construction Period : January 2008 – September 2009
Commercial Operation Date : May 2010

Central Utility Plant 2 (CUP-2)

This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.

Read More >>

Central Utility Plant (CUP-2)

This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.

Project Description

The Plant comprises 2 Gas Turbine Generate (GTG), 2 Heat Recovery Steam Generator (HRSG), 1 Steam Turbine Generator and 1 Auxiliary Boiler

Configuration

Gas Turbine Generator

Fr 6581-B, 38 MW x 2 units

Heat Recovery Stream Generator

140 ton/hour, 45 barg steam x 2 units
(full supplementary firing)

Steam Turbine Generator

38 MW x 1 unit

Auxiliary Gas Boiler

50 ton/hour, 45 barg x 1 unit

Temporary Auxiliary Gas Boiler

70 ton/hour, 45 barg x 2 units

Project Owner : PTT Utility Company Limited (PTTUT)
Construction Period : October 2006 – March 2009
Commercial Operation Date : May 2009

District Cooling
One Bangkok_Combine System CUP Building (3)

A District Cooling Plant (Initial Phase) of One Bangkok

One Bangkok Mixed Use Development Project ...

Read More >>

A District Cooling Plant (Initial Phase) of One Bangkok

One Bangkok Mixed Use Development Project located in Prime CBD at the northeast corner of the intersection of Wireless, Rama IV, and Sathorn Road, Bangkok.

Project Description:

The District Cooling Plant will generate and supply chilled water to the end-user through a district cooling ring network. This 20,000RT plant capacity project is an Initial Phase of total 40,000RT after fully developed.  

Scope of Work:

EPCC Work for DCS Plant (Initial Phase Cap. 20,000 RT + TES 10,710 RTH)

Construction Period:

January 2021 to January 2023

dp2-1

Chiller Plant Extension for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Read More >>

Chiller Plant Extension for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

The Plant is Steam Absorption Chiller System, including Mechanical Ventilation AC, Plumbing, Fire Protection, Electrical System and Civil Work

Configuration

Gas Turbine Generator

22.0 MW x 2 units

Heat Recovery Stream Generator

42.5 t/h x 2 units

Steam Turbine Generator

12.0 MW x 1 unit

Auxiliary Gas Boiler

18 t/h x 2 units and 20 t/h x 2 units

Steam Absorption Chiller for PTC

2,100 RT x 8 units (stage 1)
2,310 RT x 2 units (stage 2)

Steam Absorption Chiller for TG Catering

1,970 RT x 2 units + 1,500 RT x 3 units

Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : June 2005 – September 2006

1st Floor (13)

CHPP Plant Modification Project (Contract 2)

EPCC Works, including demolish work and improvement...

Read More >>

CHPP Plant Modification Project (Contract 2)

Scale of project :    

  • Absorption Chiller 1,600 RT x 2 units (supplied by Owner)
  • Electric Chiller 2,000 RT x 1 unit 
  • Electric Chiller 1,000 RT x 1 unit

Scope of work : EPCC Works, including demolish work and improvement the existing equipment.

Usage : Power Plant and Chiller Plant at The New Government Complex, Bangkok.

Construction period : August 2016 to August 2017

Helper Cooling Tower for PTC Chiller Plant Project

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Read More >>

Helper Cooling Tower for PTC Chiller Plant Project

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

The Project is Engineering, Procurement and Construction for Cooling Tower 2 units, to increase chilled water capacity to accommodate the increasing air conditioning load of PTC Chiller Plant.

Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : August 2010 – March 2011

Air Conditioning Work
TSL.259

Environmental Control System

The Environmental Control System (ECS) comprises the following subsystems

Read More >>

Environmental Control System

TSL.118 copy

Chilled Water System

Read More >>

Chilled Water System

TSL.123 copy

Cooling Water System

Read More >>

Cooling Water System

DSC_1

Direct Refrigerant System

Read More >>

Direct Refrigerant System

Clean Room
20190411-129r1

List of Clean Room Projects

Read More >>
Process Facility Services
cool1-3

Process Chilled Water

Read More >>

Process Chilled Water

3

Steam Utility Pipe Work

Read More >>

Steam Utility Pipe Work

Compressed Air

Read More >>

Compressed Air

exh3

Process Exhaust

Read More >>

Process Exhaust

Building Facility Services

Civil Work

Read More >>

Civil Work

ele2

Electrical System

Read More >>

Electrical System

Fire Protection System

Read More >>

Fire Protection System

Plumbing System

Read More >>

Plumbing System

Special Facility Services
OR18_Pipe Installation for ECS System at Commercial Level

MRT Orange Line (East Bound)

Read More >>

MRT Orange Line (East Bound)

Underground railway in Bangkok.

Scope of work: E&M Works for MRT Underground Stations;-

  • OR17 – Ram Khamhaeng Station
  • OR18 – SAT Station
  • OR19 – Hua Mak Station (Ram Khamhaeng 34 Station)

Construction period: October 2019 to November 2022.

MRTA–ISP–UGS_Across Tunnel Fire Pipe

M.R.T. Chaloem Ratchamongkhon Line (South Contract)

Read More >>

M.R.T. Chaloem Ratchamongkhon Line

(South Contract)

Underground railway in Bangkok.

Scope of work : Subcontractor of JOINT VENTURE BCKT for Environmental Control Systems and Fire Protection Systems for 4 stations (Queen Sirikit National Convention Centre Station, Sukhumvit Station, Phetchaburi Station, Phra Ram IX Station)

Construction period : May 2000 to August 2002.

tun4

M.R.T. Chaloem Ratchamongkhon Line (North Contract)

Read More >>

M.R.T. Chaloem Ratchamongkhon Line

(North Contract)

Underground railway in Bangkok.

Scope of work : Subcontractor of  ION-Joint Venture for Environmental Control Systems and Tunnel Ventilation Systems for 4 stations (Thai Cultural Centre Station, Huai Khwang Station, Sutthisan Station and Ratchadapisek Station), LHD for 3 stations and Intervention Shafts no. 1,2 & 3.

 Construction period : December 2000 to August 2002.