From the past decade, Thai Shinryo has expanded its interest in Co-Generation and District Cooling System (DCS) technologies to become a leading Engineering, Procurement and Construction (EPC) Contractor in Thailand. Those efforts have been in line with our corporate policy in terms of environmentally friendly, contributions to society, urban life and all mankind.

In September 2006, our first 55 MW Co-generation project, “DISTRICT COOLING SYSTEM & POWER PLANT PROJECT at SUVARNABHUMI INTERNATIONAL AIRPORT”, was complete and commercially operation for supplying Power Energy, Steam and Chilled Water to Suvarnabhumi International Airport.

Today, many SPP Projects in Thailand have been developing very fast. Meanwhile Thai Shinryo has progressively developed our team to cope with larger scale and variety of Power Generation System. We have completed more projects and achieved owner objectives as reducing air pollution, saving energy, countering global warming and efficient using of new energy resources. All of those projects were designed to provide stable and cost-effective energy supplies whilst respecting environmental friendly by the process.

Experienced Projects

BIC1

Bangpa-in Cogeneration Phase 1 Project (BIC1)

SHINRYO is an Engineering, Procurement, Construction...

Read More >>

Bangpa-in Cogeneration Phase 1 Project (BIC1)

SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC1 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.

Project Description

The BIC1 shall comprise, as a minimum, two Gas Turbine Generators, two Heat Recovery Steam Generators, one Steam Turbine Generator, and one Auxiliary Boiler including their ancillary equipment.

Configuration

Gas Turbine Generator

LM6000 PD x 2 units novated from Owner

Heat Recovery Stream Generator

57 ton/hour x 2 units

Steam Turbine Generator

23 MW x 1 unit

Auxiliary Gas Boiler

20 ton/hour x 1 unit

Water Treatment Plant

22 kV Substation and 115 kV GIS Substation

Power Distribution and Supply System and Auxiliary Substation

Steam Distribution and Supply System

Project Owner: Bangpa-in Cogeneration Limited (BIC)
Construction Period: November 2014 – June 2017
Commercial Operation Date: June 2017

DSC_0920

Bangpa-in Cogeneration Phase 2 Project (BIC2)

SHINRYO is an Engineering, Procurement, Construction...

Read More >>

Bangpa-in Cogeneration Phase 2 Project (BIC2)

SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC2 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.

Project Description

BIC2 shall consist of 2 (two) LM6000 PD Gas Turbine Generator Packages (GTG) which are novated from Owner with Inlet Air System, 2 (two) Heat Recovery Steam Generators (HRSG) capacity 57 ton/hour/unit, and 1 (One) extraction-condensing Steam Turbine Generator (STG) capacity 26 MW/unit and Water Treatment Plant.

Configuration

Gas Turbine Generator

LM6000 PD x 2 units novated from Owner

Heat Recovery Stream Generator

57 ton/hour x 2 units

Steam Turbine Generator

26 MW x 1 unit

Water Treatment Plant

Project Owner : Bangpa-in Cogeneration Limited (BIC)
Construction Period : November 2014 – June 2017
Commercial Operation Date : June 2017

Bangchak Utility Project

This Project is the Combined Heat and Power (CHP) Plant...

Read More >>

Bangchak Utility Project

This Project is the Combined Heat and Power (CHP) Plant that located within the Bangchak refinery complex in Bangkok.

Project Description

The CHP Plant consist of 2 Gas Turbine Generator (GTG), 2 Heat Recovery Steam Generator (HRSG) with supplementary firing and 1 Auxiliary Boiler for serving as back up steam source.

Configuration

Gas Turbine Generator

Titan 130, 12 MW x 2 units

Heat Recovery Stream Generator

48 ton/hour, 45.5 barg x 2 units

Auxiliary Gas Boiler

48 ton/hour, 45.5 barg x 1 unit

Project Owner : PTT Public Company Limited (PTT)
Construction Period : January 2008 – September 2009
Commercial Operation Date : May 2010

Central Utility Plant 2 (CUP-2)

This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.

Read More >>

Central Utility Plant (CUP-2)

This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.

Project Description

The Plant comprises 2 Gas Turbine Generate (GTG), 2 Heat Recovery Steam Generator (HRSG), 1 Steam Turbine Generator and 1 Auxiliary Boiler

Configuration

Gas Turbine Generator

Fr 6581-B, 38 MW x 2 units

Heat Recovery Stream Generator

140 ton/hour, 45 barg steam x 2 units
(full supplementary firing)

Steam Turbine Generator

38 MW x 1 unit

Auxiliary Gas Boiler

50 ton/hour, 45 barg x 1 unit

Temporary Auxiliary Gas Boiler

70 ton/hour, 45 barg x 2 units

Project Owner : PTT Utility Company Limited (PTTUT)
Construction Period : October 2006 – March 2009
Commercial Operation Date : May 2009

2

Power Plant Project for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Read More >>

Power Plant Project for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

This Power Plant is Cogeneration and District Cooling System.

Configuration

Gas Turbine Generator

22.0 MW x 2 units

Heat Recovery Stream Generator

42.5 t/h x 2 units

Steam Turbine Generator

12.0 MW x 1 unit

Auxiliary Gas Boiler

18 t/h x 2 units and 20 t/h x 2 units

Steam Absorption Chiller for PTC

2,100 RT x 8 units (stage 1)
2,310 RT x 2 units (stage 2)

Steam Absorption Chiller for TG Catering

1,970 RT x 2 units + 1,500 RT x 3 units

Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : January 2004 – September 2006
Commercial Operation Date : September 2006

cp4-2

Gas Turbine Replacement : Package II (BOP and Construction)

This Project located at Suvarnabhumi...

Read More >>

Gas Turbine Replacement : Package II (BOP and Construction)

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

Erection the Gas Turbine units, EPC works for all related   BOP, Testing & Commissioning for combined cycle plant.

Project size : 90 MW Net + 124 TPH Steam
Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Commercial Operation Date : Unit 1 December 2011, Unit 2 May 2012