Project Categories
From the past decade, Thai Shinryo has expanded its interest in Co-Generation and District Cooling System (DCS) technologies to become a leading Engineering, Procurement and Construction (EPC) Contractor in Thailand. Those efforts have been in line with our corporate policy in terms of environmentally friendly, contributions to society, urban life and all mankind.
In September 2006, our first 55 MW Co-generation project, “DISTRICT COOLING SYSTEM & POWER PLANT PROJECT at SUVARNABHUMI INTERNATIONAL AIRPORT”, was complete and commercially operation for supplying Power Energy, Steam and Chilled Water to Suvarnabhumi International Airport.
Today, many SPP Projects in Thailand have been developing very fast. Meanwhile Thai Shinryo has progressively developed our team to cope with larger scale and variety of Power Generation System. We have completed more projects and achieved owner objectives as reducing air pollution, saving energy, countering global warming and efficient using of new energy resources. All of those projects were designed to provide stable and cost-effective energy supplies whilst respecting environmental friendly by the process.
Experienced Projects
Bangpa-in Cogeneration Phase 1 Project (BIC1)
SHINRYO is an Engineering, Procurement, Construction...
SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 1 Project (BIC1) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC1 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.
Project Description
The BIC1 shall comprise, as a minimum, two Gas Turbine Generators, two Heat Recovery Steam Generators, one Steam Turbine Generator, and one Auxiliary Boiler including their ancillary equipment.
Configuration
Gas Turbine Generator
LM6000 PD x 2 units novated from Owner
Heat Recovery Stream Generator
57 ton/hour x 2 units
Steam Turbine Generator
23 MW x 1 unit
Auxiliary Gas Boiler
20 ton/hour x 1 unit
Water Treatment Plant
22 kV Substation and 115 kV GIS Substation
Power Distribution and Supply System and Auxiliary Substation
Steam Distribution and Supply System
Project Owner: Bangpa-in Cogeneration Limited (BIC)
Construction Period: November 2014 – June 2017
Commercial Operation Date: June 2017
Bangpa-in Cogeneration Phase 2 Project (BIC2)
SHINRYO is an Engineering, Procurement, Construction...
Bangpa-in Cogeneration Phase 2 Project (BIC2)
SHINRYO is an Engineering, Procurement, Construction and Commissioning (EPCC) Sub-contractor to co-implement a Bangpa-in Cogeneration Phase 2 Project (BIC2) as 110MW Combined Cycle Cogeneration Power Plant that located in Bangpa-in Industrial Estate, Phra Nakorn Si Ayuddhaya Province. BIC2 will supply 90MW of electricity to EGAT under SPP power purchase agreement. The remaining electricity generating capacity and all process steam will be sold to prospect Industrial Users in the Plant vicinity.
Project Description
BIC2 shall consist of 2 (two) LM6000 PD Gas Turbine Generator Packages (GTG) which are novated from Owner with Inlet Air System, 2 (two) Heat Recovery Steam Generators (HRSG) capacity 57 ton/hour/unit, and 1 (One) extraction-condensing Steam Turbine Generator (STG) capacity 26 MW/unit and Water Treatment Plant.
Configuration
Gas Turbine Generator
LM6000 PD x 2 units novated from Owner
Heat Recovery Stream Generator
57 ton/hour x 2 units
Steam Turbine Generator
26 MW x 1 unit
Water Treatment Plant
Project Owner : Bangpa-in Cogeneration Limited (BIC)
Construction Period : November 2014 – June 2017
Commercial Operation Date : June 2017
Bangchak Utility Project
This Project is the Combined Heat and Power (CHP) Plant...
Bangchak Utility Project
This Project is the Combined Heat and Power (CHP) Plant that located within the Bangchak refinery complex in Bangkok.
Project Description
The CHP Plant consist of 2 Gas Turbine Generator (GTG), 2 Heat Recovery Steam Generator (HRSG) with supplementary firing and 1 Auxiliary Boiler for serving as back up steam source.
Configuration
Gas Turbine Generator
Titan 130, 12 MW x 2 units
Heat Recovery Stream Generator
48 ton/hour, 45.5 barg x 2 units
Auxiliary Gas Boiler
48 ton/hour, 45.5 barg x 1 unit
Project Owner : PTT Public Company Limited (PTT)
Construction Period : January 2008 – September 2009
Commercial Operation Date : May 2010
Central Utility Plant 2 (CUP-2)
This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.
Central Utility Plant (CUP-2)
This Project is Auxiliary Boiler and Combined Cycle Plant that located at Rayong Province.
Project Description
The Plant comprises 2 Gas Turbine Generate (GTG), 2 Heat Recovery Steam Generator (HRSG), 1 Steam Turbine Generator and 1 Auxiliary Boiler
Configuration
Gas Turbine Generator
Fr 6581-B, 38 MW x 2 units
Heat Recovery Stream Generator
140 ton/hour, 45 barg steam x 2 units
(full supplementary firing)
Steam Turbine Generator
38 MW x 1 unit
Auxiliary Gas Boiler
50 ton/hour, 45 barg x 1 unit
Temporary Auxiliary Gas Boiler
70 ton/hour, 45 barg x 2 units
Project Owner : PTT Utility Company Limited (PTTUT)
Construction Period : October 2006 – March 2009
Commercial Operation Date : May 2009
Power Plant Project for SBIA
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Power Plant Project for SBIA
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Project Description
This Power Plant is Cogeneration and District Cooling System.
Configuration
Gas Turbine Generator
22.0 MW x 2 units
Heat Recovery Stream Generator
42.5 t/h x 2 units
Steam Turbine Generator
12.0 MW x 1 unit
Auxiliary Gas Boiler
18 t/h x 2 units and 20 t/h x 2 units
Steam Absorption Chiller for PTC
2,100 RT x 8 units (stage 1)
2,310 RT x 2 units (stage 2)
Steam Absorption Chiller for TG Catering
1,970 RT x 2 units + 1,500 RT x 3 units
Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : January 2004 – September 2006
Commercial Operation Date : September 2006
Gas Turbine Replacement : Package II (BOP and Construction)
This Project located at Suvarnabhumi...
Gas Turbine Replacement : Package II (BOP and Construction)
This Project located at Suvarnabhumi International Airport, Samutprakarn Province
Project Description
Erection the Gas Turbine units, EPC works for all related BOP, Testing & Commissioning for combined cycle plant.
Project size : 90 MW Net + 124 TPH Steam
Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Commercial Operation Date : Unit 1 December 2011, Unit 2 May 2012
3656/18-19, Green Tower 7th Floor, Rama IV Road, Klongton, Klongtoey, Bangkok 10110 Thailand
Tel : +66(0) 2249 0870 Fax : +66(0) 2249 0895
Tel : +66(0) 2249 0870
Fax : +66(0) 2249 0895